Project Completion
An I-Beam has been at our home since Easter that will hold a cable to attach to our aged garage. The garage is listing to the south. Today a bathtub shaped hole was dug for the beam’s home. Amazing what this auger could do in a short amount of time.
The beam is cemented in and it is “project completion” for now. It will take a month or so for the concrete to be totally cured before the cable is attached from the beam to the garage. This was well worth the wait. A hole 4′ x 6′ would have been back breaking with our little old time post hole digger. The concrete alone needed three huge buckets to be delivered from the concrete truck to the Bob Cat and then the final resting place. On to us moving a dirt pile that this hole has created. We do have a few places in the yard that could use some filling.